Home/Solutions/Hybrid Cloud & Data Centre
Solution

Hybrid Cloud & Data Centre

Private, public and on-premise capacity designed as one estate, then operated, not handed over.

05

At a glance

Contracted by
Multicom I.T Solutions Limited
Tier
Government and enterprise programmes
Scope
Written after a survey, and priced from what was seen
Commitment
Most data centre projects fail after commissioning, not during it. We contract for the operating years, not just the build.
Fibre and copper patch leads landed on panels and run into managed switches inside an open floor-standing rack, link lights lit
Fibre and copper landed on panels, then into managed switches. Photographed with the door open, because that is when it gets checked.
The engagement

What the engagement covers

  • Capacity and resilience design against a stated availability target
  • Build, migration and cutover with rollback planned in
  • Power, cooling and physical security specified for local conditions
  • Ongoing operation, patching and capacity reporting

How we contract it

The contracting party is Multicom I.T Solutions Limited. Where a package draws on MulticomIoT, it is declared and remains our responsibility in full.

Nothing is quoted before the survey, and the survey produces the written scope the price is built from.

Talk to us about a site